# Pool Start-Up: The First 30 Days in Naples

> Brushing, plaster dust, pH, when the heater and salt cell can come on, and who should do it: the National Plasterers Council start-up steps for a Naples pool.

[Home](https://www.splashpoolsllc.com/) / [Insights](https://www.splashpoolsllc.com/blog/) / Finishes, tile and stone Insights · Finishes, tile and stone

# What happens in the first 30 days after a pool is resurfaced, and who does the start-up?
The plaster crew packs up, the hose goes in, and the pool start-up begins: a month in which the new finish belongs to whoever is holding the test kit. Most of what goes wrong with a resurfaced pool in Naples goes wrong here, quietly, in water that looks fine from the lanai. This guide walks the first 30 days the way the National Plasterers Council lays them out: what the water is doing, what has to happen each day, when the heater, the salt cell and the swimmers can come back, and who should be doing the work. It also says plainly who does it on our own jobs.
[Clayton Waggoner](https://www.splashpoolsllc.com/about/), Owner and Managing Member, Florida license CPC1461352 · Published November 1, 2026 · 19 min read

In this article
Pool start-up is the brushing, testing and chemical adjustment that follows the filling of a freshly resurfaced pool. The National Plasterers Council says the interior finish is especially susceptible to staining, scaling and discoloration within the first 28 days, and that initial start-up procedures include frequent brushing and daily testing and adjusting of the pool water (National Plasterers Council, 2021) [1](#ref-1).
The short version
I. A new cement finish is especially susceptible to staining, scaling and discoloration within the first 28 days, and the start-up is frequent brushing plus daily testing and adjusting of the water (National Plasterers Council, 2021) [1](#ref-1).
II. Approximately 70 percent of cement hydration happens in the first 7 days and approximately 85 percent by 28 days, and plaster dust left in the water beyond the first 3 to 5 days carbonates onto the surface (National Plasterers Council, 2018) [4](#ref-4).
III. The card's order is total alkalinity to 80 to 100 ppm first, then pH to 7.2 to 7.6, then calcium hardness raised in steps, with no chlorine for 48 hours and the first dose on Day 3 at 1.5 to 3.0 ppm (National Plasterers Council, 2021) [1](#ref-1).
IV. The card holds the heater until the water is balanced and free of plaster dust (National Plasterers Council, 2021) [1](#ref-1), White Paper 6 holds the heater or chiller for 28 days (National Plasterers Council, 2025) [2](#ref-2), and the card says no salt within the first 30 days (National Plasterers Council, 2021) [1](#ref-1).
V. The water is typically started by the plastering company, and the party doing the start-up is to be determined in advance (National Plasterers Council, 2025) [2](#ref-2). On a Splash Pools resurfacing, that party is the contractor for the first month.

I.

## What happens in the first 30 days after a pool is resurfaced, and who does the start-up?
The first 30 days are a start-up, not a wait. The National Plasterers Council says the finish is susceptible to staining, scaling and discoloration within the first 28 days, and that start-up means frequent brushing and daily testing and adjusting of the water (National Plasterers Council, 2021) [1](#ref-1). White Paper 6 says the party doing that work is determined before the fill, not after (National Plasterers Council, 2025) [2](#ref-2).
Resurfacing does not end when the finish is troweled. A cement based finish keeps curing under water, and the card's description of the start-up is specific: frequent brushing and daily testing and adjusting of the pool water, in a set order, with each step done before the next (National Plasterers Council, 2021) [1](#ref-1). The month is a sequence of small daily tasks, and skipping one changes the surface.
Who does them matters as much as what they are. White Paper 6 says the water is typically started by the plastering company, and that it is important to determine the party responsible for turning off the water and the party performing the initial start-up procedures (National Plasterers Council, 2025) [2](#ref-2). On a Splash Pools resurfacing, both are the contractor for the first month. Clayton's note on this section is his own answer on why.
The rest of this guide follows the calendar: why the month matters, what the cloudy water is, fill day, the day by day chemistry in a table, the holds on the heater, the salt cell and the swimmers, who should do the work, and what the pool needs after day 28. If you are still deciding when to do the job at all, [the best time of year to resurface a pool in Naples](https://www.splashpoolsllc.com/blog/best-time-to-resurface-pool-naples/) comes first.
From Clayton Waggoner · Florida license CPC1461352
"What ruins a brand new finish fastest is not doing a proper start-up. Bad chemistry. We handle the start-up ourselves for the first month, absolutely."

[Who is answering: the licensed contractor, in the pool trade since 2012 &rarr;](https://www.splashpoolsllc.com/about/) II.

## Why does the first month matter more than the next ten years?
Because the finish is still becoming itself. Approximately 70 percent of cement hydration takes place in the first 7 days and approximately 85 percent by 28 days (National Plasterers Council, 2018) [4](#ref-4). In that window the surface is giving off calcium hydroxide, taking on whatever the water offers, and showing the result for the life of the finish. Pigment leached out by aggressive water does not come back (National Plasterers Council, 2018) [4](#ref-4).
The hydration numbers come from the Council's bulletin on loss of color. Approximately 70 percent of cement hydration takes place in the first 7 days from mixing, a significant amount more over the next 28 days to approximately 85 percent, and the remaining unhydrated cement continues to hydrate for years (National Plasterers Council, 2018) [4](#ref-4). A finish at day 10 is a different material from the same finish at day 100.
Two things happen at the surface in those weeks. The hydration reaction releases an excess of calcium hydroxide into the cement matrix, and that excess, known in the trade as plaster dust, is released into the water in the presence of moisture (National Plasterers Council, 2025) [3](#ref-3). The Council says this release is not deleterious to the finish (National Plasterers Council, 2025) [3](#ref-3). What damages the finish is leaving the dust in the water, or letting the water turn aggressive.
The bulletin is specific about both. The greatest potential for pigment masking on a new finish is within the first 3 days after the pool is filled, and plaster dust should be removed and filtered out within the first 3 to 5 days after the pool is full or it will carbonate and adhere to the surface (National Plasterers Council, 2018) [4](#ref-4). Aggressive water left for an extended period can leach pigment up to 1/8 inch deep, and the resulting color loss is irreversible (National Plasterers Council, 2018) [4](#ref-4).
That is the reason this month gets its own guide, and the reason our resurfacing jobs include it rather than hand it off on fill day. [Pool resurfacing in Naples](https://www.splashpoolsllc.com/pool-resurfacing-naples/) describes how we run a job from drain to start-up; the rest of this post is the start-up itself.
III.

## What is the cloudy gray water, and is it a problem?
It is plaster dust: excess calcium hydroxide that the curing cement releases into the water, a release the National Plasterers Council calls not deleterious to the finish (National Plasterers Council, 2025) [3](#ref-3). It is a problem only if it stays. The card says brush the entire surface at least twice daily and run the pump continuously for seven days or until the water clears, minimum 72 hours (National Plasterers Council, 2021) [1](#ref-1).
White Paper 7 describes the mechanism. During the initial stage of curing the hydration reaction releases a large amount of calcium hydroxide into the cement binder matrix, super-saturating it, and that excess is what migrates out into the water (National Plasterers Council, 2025) [3](#ref-3). It looks like a fine white or gray haze, it settles on the steps and the floor, and it comes off on a brush.
The clock on it is short. Technical Bulletin 4 says the dust should be removed and filtered out within the first 3 to 5 days after the pool is full, or it will carbonate and adhere to the surface, and that calcium carbonate can be difficult and expensive to remove (National Plasterers Council, 2018) [4](#ref-4). Brushing lifts it off the finish; the filter takes it out of the water. Both have to run.
That is why the card writes its Day 1 circulation step as a rule: continuous operation of the pumps and filtration system is mandatory for seven days, or until the plaster dust has been brushed away and filtered out and the water is no longer cloudy, with a minimum of 72 hours (National Plasterers Council, 2021) [1](#ref-1). If the system is not removing the dust, White Paper 6 says to use a portable pool filtration system (National Plasterers Council, 2025) [2](#ref-2).
Wheeled cleaners wait. The card says wheeled vacuums or wheeled pool cleaners should not be used until after 28 days, while brush vacuums and non-wheeled cleaners are allowed (National Plasterers Council, 2021) [1](#ref-1). White Paper 6 words it differently: no wheeled vacuums until the water is balanced and no cloudiness remains, typically 7 to 10 days after fill, or per the manufacturer (National Plasterers Council, 2025) [2](#ref-2). On Day 7, the card says any remaining dust comes out with a brush pool vacuum (National Plasterers Council, 2021) [1](#ref-1).

A pale haze in the first days of a new fill is part of how a new finish starts out. IV.

## What happens on fill day?
Fill day is seven steps on the card. Confirm the filtration equipment works, put a clean cloth on the end of the hose and set it in the deepest part of the pool, fill to the middle of the skimmer without interruption, keep every other water source and every person out, test the fill water, then start the pump the moment the pool is full and leave the heater off (National Plasterers Council, 2021) [1](#ref-1).
The cloth and the hose placement protect the surface where the water lands. If a water truck is used, the card says to place an initial 24 inches of water in the deepest area as a cushion, then let the truck's water cascade into it (National Plasterers Council, 2021) [1](#ref-1). At no time should any person or pets be in the pool during the fill (National Plasterers Council, 2021) [1](#ref-1).
The fill must not stop. White Paper 6 says any interruption can cause an unsightly discoloration, or bowl ring, at the level where the water stopped, and that a prolonged stoppage can increase visible shrinkage cracking above that level (National Plasterers Council, 2025) [2](#ref-2). Water from any external source is kept out to help prevent streaking (National Plasterers Council, 2021) [1](#ref-1).
The fill water itself is tested for pH, total alkalinity, calcium hardness and metals, and the results are recorded (National Plasterers Council, 2021) [1](#ref-1). That test matters more in Collier County than in most places. The county health department's operators' manual says Collier public water supplies in general do not have enough calcium for correct pool water balance (Florida Department of Health in Collier County, 2016) [7](#ref-7), and White Paper 7 says fill water should be above 200 ppm calcium hardness, or above 150 ppm for some high-performance finishes (National Plasterers Council, 2025) [3](#ref-3). The same test across the county line is in [the Lee County fill water guide](https://www.splashpoolsllc.com/blog/bonita-springs-estero-fort-myers-pool-fill-water/).
Soft water and reverse osmosis water are ruled out as fill water (National Plasterers Council, 2025) [2](#ref-2), because low calcium water in contact with a new finish can leach calcium hydroxide from the surface beyond the excess and weaken the cement binder (National Plasterers Council, 2025) [3](#ref-3). What that means for a hose on a Naples meter is the subject of [Collier County tap water and new pool plaster](https://www.splashpoolsllc.com/blog/collier-county-tap-water-new-pool-plaster/).
V.

## What does the start-up crew test and adjust, day by day?
The card takes total alkalinity to 80 to 100 ppm, then pH to 7.2 to 7.6, then calcium hardness in steps: 80 to 100 ppm on Day 1, 100 to 150 on Day 2, a minimum of 200 by Day 4, with cyanuric acid to 30 to 50 ppm from Day 4, no chlorine for 48 hours and a first dose on Day 3 of 1.5 to 3.0 ppm (National Plasterers Council, 2021) [1](#ref-1).
The order is the point. The card says, in capitals, that it is important to follow each step in the recommended order before proceeding to the next (National Plasterers Council, 2021) [1](#ref-1). The Collier County manual explains why from the public pool side: total alkalinity stabilizes pH, so it should always be adjusted first, and only once it is in range should pH be adjusted (Florida Department of Health in Collier County, 2016) [7](#ref-7).
Calcium goes in slowly for the same reason. The card says calcium chloride should be dissolved and added in 10 lb increments with each dose separated by several hours, and never at the same time as sodium bicarbonate (National Plasterers Council, 2021) [1](#ref-1). Cyanuric acid goes in through the skimmer with the pumps running for a minimum of three days, with the whole finish brushed after each addition, because concentrated CYA can cause pigmented finishes to discolor (National Plasterers Council, 2021) [1](#ref-1).
The table condenses the card. One caveat belongs beside it: the card describes its procedures as sound technical practices in the industry that are advisory and non-binding, and it allows for changes when the fill water is unusual in hardness, pH or alkalinity (National Plasterers Council, 2021) [1](#ref-1). White Paper 6 calls the card the recommended method, notes that other procedures are known to produce similar good results, and says proprietary finishes follow the manufacturer's instructions (National Plasterers Council, 2025) [2](#ref-2).
The NPC Pool Start-up Card, REV 03-2021, condensed by day (National Plasterers Council, 2021) [1]
Day Test and adjust Brush, pump and holds
Day 1 Test pH, total alkalinity and calcium hardness and record the results. Alkalinity to 80 to 100 ppm (pre-diluted muriatic acid to lower it, sodium bicarbonate to raise it), then pH to 7.2 to 7.6, then calcium hardness up to 80 to 100 ppm in 10 lb doses several hours apart. A sequestering agent is optional. Brush the entire surface at least twice daily. Run the pump continuously for seven days or until the water is clear, minimum 72 hours. No chlorine for 48 hours. No heater while plaster dust remains. No wheeled cleaners.
Day 2 Retest and repeat Day 1 except the sequestering agent. Once alkalinity is 80 to 100 ppm and pH is 7.2 to 7.6, raise calcium hardness to 100 to 150 ppm in the same stepped doses. Brush at least twice daily. Pump still continuous. Still no chlorine.
Day 3 Add pre-diluted or liquid chlorine to 1.5 to 3.0 ppm. For salt water (SWCG) pools, do not add salt within the first 30 days. Brush the entire surface at least twice daily. Pump continuous.
Days 4 to 7 Hold pH and alkalinity at the Day 2 ranges each day. On Day 4, raise calcium hardness slowly to a minimum of 200 ppm and begin cyanuric acid to 30 to 50 ppm through the skimmer over a minimum of three days, brushing the whole finish after each addition. Brush twice daily and keep the pump continuous each day through day seven. In-floor cleaners and directional eyeballs can go back once the chemistry is balanced. On Day 7, any remaining plaster dust comes out with a brush pool vacuum.
Days 7 to 28 Daily testing and adjusting continues at the same ranges. Once the dust is gone and a good cleaning system is in place, brushing can be limited to visible material and chemical additions. Wheeled vacuums and wheeled cleaners only after 28 days.
After 28 days Switch to the maintenance ranges and hold the Langelier Saturation Index between 0.0 and +0.3, especially in the first six months. The ongoing program, covered in the last section of this guide.

Brushing is part of the first weeks of every new plaster finish. VI.

## When can the heater, the salt cell and the swimmers come back?
Each has its own hold. The card says do not turn on the heater until the water is chemically balanced and no plaster dust remains, per the manufacturer (National Plasterers Council, 2021) [1](#ref-1), while White Paper 6 says no heater or chiller for 28 days (National Plasterers Council, 2025) [2](#ref-2). The card says no salt within the first 30 days, and no swimming until the water is balanced and sanitized (National Plasterers Council, 2021) [1](#ref-1).
The two heater holds are both NPC, and they are not the same. The 2021 card ties the heater to a condition: chemically balanced water and no cloudiness, and it repeats on Day 1 that the heater stays off until there is no plaster dust in the pool (National Plasterers Council, 2021) [1](#ref-1). The 2025 white paper gives a number instead: do not turn on the pool heater or chiller for 28 days (National Plasterers Council, 2025) [2](#ref-2). Planning on the longer of the two satisfies both.
Salt is the clearest line on the card. In the Day 3 chlorine step it flags as important that for salt water (SWCG) pools, salt is not to be added within the first 30 days (National Plasterers Council, 2021) [1](#ref-1). In the meantime the pool is sanitized with liquid or pre-diluted chlorine at 1.5 to 3.0 ppm (National Plasterers Council, 2021) [1](#ref-1). Clayton's first note on this section is his own practice with the salt cell, and [salt water pools and plaster finishes](https://www.splashpoolsllc.com/blog/salt-water-pool-plaster-finish-naples/) covers what the cell does to the water over the years that follow.
Swimmers wait for chemistry, not for a date. Both the card and White Paper 6 say it is not recommended to swim until the water is properly balanced and sanitized, and that no person or pet should be in the pool during the fill (National Plasterers Council, 2021; National Plasterers Council, 2025) [1](#ref-1) [2](#ref-2). The card's sequence puts the first chlorine on Day 3 and the dust clearing somewhere inside seven days of continuous filtration (National Plasterers Council, 2021) [1](#ref-1), so the earliest realistic swim follows both.
A spa that shares its water with the pool is on the same chemistry, the same dust and the same holds. The card's instruction is to brush the entire pool surface, and it does not carve out a separate spa schedule (National Plasterers Council, 2021) [1](#ref-1). Clayton's second note here is what he does with the spa in that month, and [refinishing a spa with the pool](https://www.splashpoolsllc.com/blog/refinish-spa-with-pool-naples/) explains why the two are usually done together.
From Clayton Waggoner · Florida license CPC1461352
"Absolutely, a salt pool is different with a new finish. The salt chlorine generator should not be run for the first month, because it raises the pH significantly, which can cause scaling."

"When the spa shares water with the pool, you continue operation as usual but brush the spa every few days for the first month."

[Who is answering: the licensed contractor, in the pool trade since 2012 &rarr;](https://www.splashpoolsllc.com/about/) VII.

## Who should be doing all this, the contractor or your pool service?
Whoever was named before the fill. White Paper 6 says the water is typically started by the plastering company and that the party performing the initial start-up must be determined in advance (National Plasterers Council, 2025) [2](#ref-2). Here, that is the contractor for the first month. After that, the Council's disclosure says the longevity of the surface depends on the water chemistry after start-up being properly maintained (National Plasterers Council, 2015) [9](#ref-9).
The Council does not say the plasterer always does it. White Paper 6 says the plastering company typically starts the water, and it treats the start-up itself as a separate responsibility that has to be assigned to somebody (National Plasterers Council, 2025) [2](#ref-2). Technical Bulletin 1 lists the candidates: plasterers, builders, service companies and start-up persons, all of whom it says should make pre-testing of the source water a mandatory requirement in their business practices (National Plasterers Council, 2019) [5](#ref-5).
Owners do it too. The same bulletin says consumers who start up their own pool should be provided a copy of it, advising them of that industry practice (National Plasterers Council, 2019) [5](#ref-5). The card is written to be followed by anyone who can test water and hold a brush, and its footer says what it is: sound technical practices in the industry, advisory and non-binding (National Plasterers Council, 2021) [1](#ref-1).
Our practice is simpler to state than to do. The contractor who installed the finish does the first month, following the card, and hands the pool to the service company after day 28 with the recorded test results the card asks for at every step (National Plasterers Council, 2021) [1](#ref-1). Clayton's note on this section is what he has seen in the pools he resurfaced years ago, and [his page](https://www.splashpoolsllc.com/about/) has the rest of his answers.
What to ask a service company before day 28: whether they test and adjust daily and record the results (National Plasterers Council, 2021) [1](#ref-1), whether they know the heater and salt holds, which ranges they hold pH and calcium to, and whether they will keep wheeled cleaners out until the card's 28 days are up (National Plasterers Council, 2021) [1](#ref-1). [How long a pool resurfacing lasts in Naples](https://www.splashpoolsllc.com/blog/how-long-pool-resurfacing-lasts-naples/) is the long version of why those answers matter, and [the resurfacing page](https://www.splashpoolsllc.com/pool-resurfacing-naples/) covers how the handoff works on our jobs.
From Clayton Waggoner · Florida license CPC1461352
"Of the pools I resurfaced years ago, the ones that still look good have one thing in common: good pool chemistry from the service company cleaning the pool. If I could tell every pool owner in Naples one thing, that is it."
The same answer he gave to the two questions, years apart, about what makes a finish last.

[Who is answering: the licensed contractor, in the pool trade since 2012 &rarr;](https://www.splashpoolsllc.com/about/) VIII.

## What does the pool need after day 28?
A maintenance program with the LSI held between 0.0 and +0.3, especially in the first six months, and the card's ranges: free chlorine 1 to 3 ppm, pH 7.2 to 7.6, carbonate alkalinity 80 to 120 ppm, calcium hardness 200 to 400 ppm, cyanuric acid 30 to 50 ppm (National Plasterers Council, 2021) [1](#ref-1). The Council's web page gives a wider general pH range of 7.2 to 7.8 (National Plasterers Council, retrieved 2026) [6](#ref-6).
The index is the number that ties the ranges together. The card says a negative LSI will cause leaching, etching or discoloration of the surface, and a positive LSI will cause mineral scaling, metal staining or discoloration (National Plasterers Council, 2021) [1](#ref-1). The Collier County manual teaches the same calculation to public pool operators as the saturation index, built from pH, water temperature, calcium hardness, total alkalinity and total dissolved solids (Florida Department of Health in Collier County, 2016) [7](#ref-7).
Temperature is the Naples term in that equation. The manual says normal pool temperatures in Collier County vary between 80 and 90 F and that calcium is less soluble in warm water, and its factor table gives 0.7 at 84 F and 0.8 at 94 F (Florida Department of Health in Collier County, 2016) [7](#ref-7). The card's own LSI table carries the same two values (National Plasterers Council, 2021) [1](#ref-1).
On pH the documents differ slightly, and the difference is worth stating. The card holds 7.2 to 7.6 for both start-up and maintenance (National Plasterers Council, 2021) [1](#ref-1). The Council's water chemistry page gives 7.2 to 7.8 as the general range, calling water below 7.2 aggressive and water above 7.8 scaling (National Plasterers Council, retrieved 2026) [6](#ref-6). The CDC's home pool page recommends 7.0 to 7.8 with at least 1 ppm chlorine, tested at least twice per day (Centers for Disease Control and Prevention, 2024) [8](#ref-8). For a new finish, the card's narrower band is the one to hold.
Two more card rules carry past the month. Cyanuric acid at 100 ppm and above may cause permanent deterioration of the pool surface, and carbonate alkalinity is total alkalinity minus one third of the cyanuric acid (National Plasterers Council, 2021) [1](#ref-1). If the pool will be left for the summer, [leaving a Naples pool alone for the summer](https://www.splashpoolsllc.com/blog/naples-pool-left-alone-summer-away/) covers what the chemistry needs while nobody is home, and [salt water and plaster](https://www.splashpoolsllc.com/blog/salt-water-pool-plaster-finish-naples/) covers what changes once the cell finally comes on.

"A finish is decided twice: once by the crew that trowels it, and once by whoever holds the test kit for the next 28 days."

Ask Clayton

## Questions this article usually prompts
Tap a question. Clayton replies himself, here and on the phone.

** **[Clayton Waggoner](https://www.splashpoolsllc.com/about/)** *Owner and Managing Member · Florida license CPC1461352* Prewritten answers
Tap a question to ask

[Not covered here? Call 239-450-5933, it reaches Clayton, not a call center](tel:+1-239-450-5933)

If this is the situation you are in
[The whole project: How does a Naples pool resurfacing project run, from first decision to first month? &rarr;](https://www.splashpoolsllc.com/blog/pool-resurfacing-homeowners-guide-naples/) [Pool resurfacing in Naples, including the part everyone skips &rarr;](https://www.splashpoolsllc.com/pool-resurfacing-naples/)[Pool remodeling in Naples, handled as one project &rarr;](https://www.splashpoolsllc.com/pool-remodeling-naples/)[Spa remodels and new attached spas in Naples &rarr;](https://www.splashpoolsllc.com/spa-remodeling-naples/)[Pool repair in Naples, diagnosed before it is quoted &rarr;](https://www.splashpoolsllc.com/pool-repair-naples/)
References

- [National Plasterers Council, NPC Pool Start-up Card: Start-Up Procedures and Water Chemistry and Maintenance, REV 03-2021](https://www.nationalplastererscouncil.com/wp-content/uploads/2022/01/npc-pool-start-up-english.pdf)
- [National Plasterers Council, White Paper 6: Tips on Filling the Pool and Initial Start Up (approved 27 February 2025)](https://nationalplastererscouncil.com/wp-content/uploads/2025/08/NPC.White-Paper.6.Tips-on-Filling-the-Pool-and-Initial-Start-Up.Approved.Final_.2.27.25.pdf.pdf)
- [National Plasterers Council, White Paper 7: Avoiding Soft Water or Water with a Low Calcium Hardness (approved 8 August 2025)](https://nationalplastererscouncil.com/wp-content/uploads/2025/08/NPC.White-Paper.7.Avoiding-Soft-Water-and-Low-Calcium-Hardness.White-Paper.Approved.FINAL_.8.8.25.pdf)
- [National Plasterers Council, Technical Bulletin #4: The Most Common Reasons for Loss of Color (April 2018)](https://nationalplastererscouncil.com/wp-content/uploads/2021/12/tech-bull-4-most-common-reasons-loss-color.pdf)
- [National Plasterers Council, Technical Bulletin #1: Testing Fill Water (revised January 2019)](https://nationalplastererscouncil.com/wp-content/uploads/2021/12/tech-bull-1-testing-fill-water.pdf)
- [National Plasterers Council, Pool Water Chemistry Effects & Prevention, retrieved 1 November 2026](https://nationalplastererscouncil.com/water-chemistry/)
- [Florida Department of Health in Collier County, Swimming Pool Operators’ Manual, 2016 Version](https://collier.floridahealth.gov/wp-content/uploads/sites/14/2025/07/2016PoolTechnicianManualEnglish.pdf)
- [Centers for Disease Control and Prevention, Home Pool and Hot Tub Water Treatment and Testing (May 10, 2024)](https://www.cdc.gov/healthy-swimming/about/home-pool-and-hot-tub-water-treatment-and-testing.html)
- [National Plasterers Council, Pool Interior Finish Disclosure (revised 16 December 2015)](https://nationalplastererscouncil.com/wp-content/uploads/2023/05/pool-interior-finish-disclosure.pdf)
[All articles &rarr;](https://www.splashpoolsllc.com/blog/)

## The article is general. Your pool is specific.

Tell us what the pool is doing, a sentence or two is enough. The person who wrote this is
the person who calls back.

[Call 239-450-5933](tel:+1-239-450-5933) [Book a consultation](https://www.splashpoolsllc.com/booking/)
